October 3, 2011
Watch as Steve McCracken, general manager of the Kingston Ash Spill recovery site talks about how heavy equipment operators are building a containment wall, which will cost $25-50 million. The wall is being built to enclose a 200-acre space for ash sediment and should withstand an earthquake.





