Skip to main content
Monday, November 16, 2026Nov 16

Chattanooga eyes $2.8 million upgrade for Walnut Street Bridge

28-million-upgrade-eyed-for-walnut-street-bridge
28-million-upgrade-eyed-for-walnut-street-bridge

OTHER PROJECTSOther projects in Mayor Berke’s proposed capital budget include:• Renaissance Park Pedestrian Bridge: $350,000• Broad Street protected bike lanes: $220,000• Virginia Avenue bike lane and green way: $325,000

photo Fishermen work the water in the Tennessee River near the Walnut Street Bridge on Sunday.

Twenty years after saving the Walnut Street Bridge, community leaders say the 2,376-foot-long connector from the North Shore to downtown needs to be repainted, its rotting boards replaced and lights fixed.

Mayor Andy Berke’s 2015 proposed capital budget includes nearly $3 million over the next three years to do just that.

The 123-year-old bridge, used today exclusively by pedestrians, spans the Tennessee River and is considered one of the crown jewels in the Scenic City’s riverfront renaissance.

Even as the City Council takes its first glimpse at the 2015 capital budget today, the city has already requested bids for a firm to inspect the bridge to determine safety needs, such things as cables, railing, deck and lighting. Work is expected to include replacing much of the bridge’s timber.