ALLEN G. BREED
CURT ANDERSON
Associated Press Writers
Undersea robots were trying to thread a small tube into the jagged pipe that is pouring oil into the Gulf of Mexico in BP’s latest attempt to cut down on the spill from a blown-out well that has pumped out more than 4 million gallons of crude.
The company planned to move the 6-inch (15-centimeter) tube into the leaking 21-inch (53-centimeter) pipe – known as the riser – on Thursday night. The smaller tube will be surrounded by a stopper to keep oil from leaking into the sea, which could be in place by Friday, BP said. The plan is for the tube to siphon the oil to a tanker at the surface.