Skip to main content
Saturday, October 31, 2026Oct 31

This story is free to read.

McBrien Road closed next five days at Ringgold Road for water line work starting Monday

Staff Photo by Ben Benton / A worker with A-1 Barricades pulls an orange barricade into position on the south side of Ringgold Road at McBrien Road on Monday in East Ridge. Contractor Elsinger Construction is beginning a project to install new water lines in the 1500 block of McBrien Road. The work is expected to take five days.
Staff Photo by Ben Benton / A worker with A-1 Barricades pulls an orange barricade into position on the south side of Ringgold Road at McBrien Road on Monday in East Ridge. Contractor Elsinger Construction is beginning a project to install new water lines in the 1500 block of McBrien Road. The work is expected to take five days. Staff Photo by Ben Benton / A worker with A-1 Barricades pulls an orange barricade into position on the south side of Ringgold Road at McBrien Road on Monday in East Ridge. Contractor Elsinger Construction is beginning a project to install new water lines in the 1500 block of McBrien Road. The work is expected to take five days.

Some motorists on Ringgold and McBrien roads in East Ridge found a detour in place starting Monday so work crews can install waterlines in a project expected to take five days.

Eslinger Construction crews will close the 1500 block of McBrien Road at the intersection with Ringgold Road near the Food Lion grocery store and Discovery Outlet, according to a news release from Bridgett Raper, spokesperson for Hamilton County’s Small Cities Coalition.

(READ MORE: Bridge work stops on I-75/I-24 project in Chattanooga amid beam problems)

“During this phase of construction, the intersection will remain closed up to Stone Street while crews install new water lines,” Raper said in the release. “During this closure, all traffic attempting to access the 1500 block of McBrien Road from Ringgold Road will be redirected to Tombras Avenue and Prigmore Road where alternate route and detour signs will be placed to redirect traffic.”

The McBrien-Ringgold intersection is the southern terminus for the nearly complete $9 million multi-modal project that extends along the sides of Ringgold Road to the Weldon Drive area. The waterline work does not appear to be in a location where it disturbs Ringgold Road’s now-complete 10-foot wide sidewalk.

(SIGN UP: Get today’s Chattanooga area news, sports and entertainment directly to your inbox. Sign up for our free newsletters at timesfreepress.com/newsletters.)

During the water line work, officials said, all motorists attempting to access McBrien Road from Ringgold Road will see alternate routes and detour signs redirecting traffic. Eslinger will reopen the intersection once the lines are installed.

Anyone who experiences an emergency in the construction area should call 911 or contact the East Ridge Police Department at 423-622-1725, Raper said.

— Compiled by Ben Benton