Skip to main content
Monday, November 16, 2026Nov 16

This story is exclusive to subscribers.

TVA rewinds 275-ton rotor to extend life of Chickamauga Dam

Staff photo by Abby White / The interior of the Chickamauga Dam is shown Sept. 16, 2025, as the Tennessee Valley Authority gave a tour of the dam.
Staff photo by Abby White / The interior of the Chickamauga Dam is shown Sept. 16, 2025, as the Tennessee Valley Authority gave a tour of the dam.

Seventy feet below the surface of Chickamauga Lake, the atmosphere between the walls of the 85-year-old dam holding back the reservoir is similar to a cave.

Stalactites of calcium hang from the ceiling. Water drips slowly through seams in the concrete walls, which still bear the wood grain of frames used to build the dam in the late 1930s. An open drainage stream running along a corridor is filled with freshwater clam or mussel shells. The air is clammy, too, heavy with moisture and cut by occasional pockets of coolness.

“You get a nice breeze down here, but it’s still muggy as all get out,” said Robby Floyd, a Tennessee Valley Authority general manager overseeing hydroelectric dams, during a tour Tuesday.

Floyd stood before a heavy metal door that typically separates the corridor from thousands of gallons of water pouring each second through one of Chickamauga Dam’s four turbines.

TVA rewinds 275-ton rotor to extend life of Chickamauga Dam

(READ MORE: TVA faces MAGA anger as it works to achieve Trump’s energy agenda)