The city of Red Bank is moving forward with plans for a city park at 3715 Dayton Blvd., the 12-acre former site of Red Bank Middle School that has been empty since the school was demolished in 2013.
Earlier this month the City Commission voted to award engineering consultants Kimley-Horn and Associates a contract to provide design and construction documents as well as construction, engineering and inspection services for the first phase of the park.
“Your application is beautiful,” Mayor Stefanie Dalton said to Cameron Cooper, a landscape architect with Kimley-Horn who’s spearheading the project, at the commission’s Sept. 15 work session. “There’s obviously a lot of talented folks at Kimley-Horn, so we’re very excited to continue working with you all.”
The city also contracted with Kimley-Horn in 2024 to gather public input and develop the city’s Parks and Recreation Master Plan, and in 2025 to prepare a detailed site plan for the park at 3715 Dayton Blvd.
Among the features included in Kimley-Horn’s site plan for the park were bike trails, a pavilion, a restroom, an inline hockey and soccer court, a pollinator garden and an outdoor classroom.
