Skip to main content
Friday, October 30, 2026Oct 30

This story is free to read.

Largest destroyer built for Navy headed to sea for testing

BATH, Maine (AP) – The largest destroyer ever built for the U.S. Navy headed out to sea for the first time Monday, departing from shipbuilder Bath Iron Works and carefully navigating the winding Kennebec River before reaching the open ocean where the ship will undergo sea trials.

More than 200 shipbuilders, sailors and residents gathered to watch as the futuristic 600-foot, 15,000-pound USS Zumwalt glided past Fort Popham, accompanied by tugboats.

Kelley Campana, a Bath Iron Works employee, said she had goose bumps and tears in her eyes.

“This is pretty exciting. It’s a great day to be a shipbuilder and to be an American,” she said. “It’s the first in its class. There’s never been anything like it. It looks like the future.”

Larry Harris, a retired Raytheon employee who worked on the ship, watched it depart from Bath.