Skip to main content
Monday, November 16, 2026Nov 16

Hixson drivers rejoice: Lake Resort Drive bridge fully open

Staff photo by Matt Hamilton / Chattanooga Public Works Administrator Jerramy Wood speaks as city council member Ken Smith, left, and Mayor Tim Kelly, right, look on during the Lake Resort bridge ribbon cutting on Friday, Nov. 22, 2024.
Staff photo by Matt Hamilton / Chattanooga Public Works Administrator Jerramy Wood speaks as city council member Ken Smith, left, and Mayor Tim Kelly, right, look on during the Lake Resort bridge ribbon cutting on Friday, Nov. 22, 2024.

Hixson-area drivers rejoice: Lake Resort Drive fully opened Friday, a year and a half after the first closures for a new bridge over a section damaged by sliding earth.

“It has been a very, very long time coming,” Chattanooga City Council member Ken Smith, of Hixson, said at a ribbon cutting event for the bridge Friday. “I’m sure there’s plenty of people out there that are doubtful that this is actually going to open, so they’re going to be really surprised on their way home.”

The road has had problems with slope failure since 2013, when Smith was first elected, and past attempts to repair the road haven’t held.

“You cannot fight Mother Nature,” Smith said.

In 2019, heavy rainfall caused a break in the road’s surface, making it separate slowly. The following year, the road was reduced to a single lane.