PEMBROKE — Connie Shreve brought her canoe paddle and life jacket with her Thursday to a public hearing at an elementary school cafeteria miles away from the closest waterway.
She packed in the props to make a point during a public hearing regarding Hyundai Motor Group’s wastewater permit. The South Korean automaker is seeking state approval to pump its industrial waste from its massive electric vehicle assembly plant to a soon-to-open treatment facility and from there into the nearby Ogeechee River. The factory, located along 1-16 about 25 miles west of downtown Savannah, opened last October.
Shreve operates an outdoors recreation business, Ogeechee Outpost, downstream from where the treated water will be discharged into the river. She said there are “too many pipes” in the river.
“The Ogeechee deserves a lot more respect,” Shreve said. “It shouldn’t be treated like a ditch.”
Shreve was among fewer than a dozen local residents to attend the hearing, the second in two days involving wastewater draft permits for operators on the nearly 3,000-acre manufacturing campus. EPD officials on Wednesday conducted an even more sparsely attended public hearing on a permit related to an EV battery plant, being built adjacent to the assembly facility. That factory is a joint venture between Hyundai and LG Energy Solution and is projected to open next year.
